Updated Nov 17, 2026· 6 min read

Key takeaways

  • A 125-amp, 20 to 30-space sub panel suits a garage, workshop, or finished basement addition, while a smaller 60 to 100-amp panel with 8 to 16 spaces is usually enough for a single addition like a shed, small accessory dwelling,…

A 125-amp, 20 to 30-space sub panel suits a garage, workshop, or finished basement addition, while a smaller 60 to 100-amp panel with 8 to 16 spaces is usually enough for a single addition like a shed, small accessory dwelling, or a handful of new circuits. Sub panel sizing and installation involve code requirements that vary by location, so this guide covers what to look for in the panel itself — final sizing and hookup should go through a licensed electrician or your local permitting office.

What a sub panel does and why breaker selection matters

A sub panel, also called a subpanel or secondary panel, takes a feed from your main electrical panel and distributes it to a new set of breakers, usually to extend power to a detached garage, finished basement, workshop, or home addition without running every new circuit back to the already-crowded main panel. The panel itself is really a breaker-compatible enclosure — the actual breakers are typically sold separately or in a kit, and they must be listed as compatible with that specific panel brand and model. Using mismatched breakers, even ones that physically fit, can void a listing and create a safety hazard, which is why manufacturers publish compatibility charts for their panels.

Panels are rated by their maximum amperage (commonly 60, 100, 125, or 200 amps) and by the number of circuit spaces they offer, which determines how many single-pole or double-pole breakers can be installed. Main breaker panels include a built-in disconnect for the whole panel, while main lug-only panels rely on an upstream breaker for that protection — which type you need depends on how the feed from your main panel is set up, and a licensed electrician should confirm this for your specific installation.

Picks by use case

For a detached garage or workshop with moderate tool and lighting loads, a 100 to 125-amp sub panel with 20 to 24 spaces from an established brand like Square D’s QO series, Eaton’s BR series, or Siemens’ PL series gives enough room for future circuits without over-building. For a smaller addition like a shed, small outbuilding, or just a few added circuits, a compact 60 to 100-amp panel with 8 to 12 spaces keeps cost and installation complexity down while still covering lighting, a few outlets, and light equipment. For a larger finished basement or an addition with its own HVAC, kitchen, or heavy appliance circuits, a 150 to 200-amp panel with 30-plus spaces gives headroom for higher-draw circuits and future expansion.

Whatever size you choose, buy breakers from the same manufacturer as the panel or confirm on the manufacturer’s published compatibility list that a third-party breaker is explicitly approved — code officials in most jurisdictions will flag incompatible breaker brands during inspection.

Type Best for Key stated specs Limits
Compact 60-100A panel (8-12 spaces) Sheds, small additions, a handful of new circuits Lower amperage ceiling, fewer breaker slots Limited room for future expansion
Mid-size 100-125A panel (20-24 spaces) Garages, workshops, moderate home additions Balanced amperage and space count May need upsizing for heavy appliance loads
Large 150-200A panel (30+ spaces) Finished basements, additions with HVAC or kitchens High amperage ceiling, generous breaker count Higher cost, needs adequate feed capacity from main panel

Fit, code, and safety notes

The feed wire and breaker protecting that feed in the main panel must be sized to match the sub panel’s rated amperage — an electrician calculates this based on the distance run and the total expected load, not just the sub panel’s label. Most jurisdictions require a permit and inspection for a new sub panel installation, and many also require a grounding electrode or bonding setup specific to whether the sub panel is in the same structure as the main panel or a separate detached building. Outdoor or detached-structure sub panels generally need a rating appropriate for the environment and specific grounding treatment that differs from an indoor panel in the same building as the service entrance — this is an area where following your local electrical code and an electrician’s guidance matters more than any product spec sheet.

Because sub panel work involves live electrical service and code compliance that varies significantly by jurisdiction, this is one area where even confident DIYers typically still need a licensed electrician to pull the permit, make the final connections, and pass inspection.

Pick X if…

Pick this If…
Compact 60-100A panel You’re adding a handful of circuits to a shed or small space
Mid-size 100-125A panel You’re wiring a garage or workshop with moderate tool loads
Large 150-200A panel You’re finishing a basement or adding heavy-appliance circuits

Alternatives worth a look

A load center upgrade or expansion on the existing main panel is worth discussing with an electrician if you only need a few more circuit spaces and the main panel has room and capacity, since it can avoid the cost of a second panel and feed run entirely. A smart or combination-breaker-equipped panel that adds arc-fault and ground-fault protection in a single breaker is increasingly common and may be required by current code in certain rooms or circuit types — check with your electrician about what your local code now requires for new circuits. For a detached structure a good distance from the house, a separate small service rather than a fed sub panel is sometimes the more practical and code-compliant route, which again is a conversation for a licensed electrician familiar with your site.

Frequently Asked Questions

Do I need a permit to install a sub panel?

Nearly every jurisdiction in the United States requires a permit and inspection for a new sub panel installation, since it involves modifying the home’s electrical service. Skipping the permit can create problems with insurance claims and future home sales even if the work itself is done correctly. Check with your local building department before starting any sub panel project.

Can I install a sub panel myself?

Some jurisdictions allow homeowner electrical work with a permit, but sub panel installation involves calculating feed wire sizing, grounding requirements, and breaker compatibility that go well beyond a simple outlet swap. Mistakes in this work carry real fire and shock risk. Most homeowners are better served hiring a licensed electrician for this specific job, even if they handle simpler electrical tasks themselves.

What’s the difference between a main breaker panel and a main lug panel?

A main breaker panel has its own built-in disconnect that can shut off power to the entire panel, while a main lug-only panel relies on a breaker upstream, typically in the main panel, for that protection. Which type is appropriate depends on the specific feed setup and local code requirements. An electrician will specify which type your installation needs based on the distance and configuration of the feed.

Why do breakers need to match the panel brand?

Panels are tested and listed by safety organizations only with specific breaker models, and using an unlisted breaker — even one that physically fits — can create arcing or overheating risks that the panel’s listing did not account for. Inspectors in most areas will reject unlisted breaker combinations during a permit inspection. Always check the panel manufacturer’s published compatibility list before buying breakers separately.

How many circuits can a sub panel support?

This depends on the number of breaker spaces in the panel and whether you use single-pole or double-pole (240V) breakers, which take up one or two spaces respectively. A panel with 24 spaces might support fewer actual circuits if several are 240V appliance circuits. Plan your expected circuit count, including future additions, before choosing a panel size.

What size wire feeds a sub panel?

Feed wire size depends on the sub panel’s amperage rating and the distance of the run, since longer runs need larger wire to avoid excessive voltage drop. This calculation is part of what a licensed electrician determines before installation, and it is not something to estimate from a general chart alone. Undersized feed wire is a common and serious code violation in sub panel installations.

C
Coworkingng Editorial Team
We compare specs, materials and verified owner reviews before a product earns a spot. Rankings are never paid.
Affiliate disclosure. As an Amazon Associate we earn from qualifying purchases at no extra cost to you. Prices accurate as of the date shown.